Exeter Chiefs Rugby Club
Sandy Park Stadium and Training Pitches
|
|
|
Client:
Kestrel Contractors Limited
Date:
2006 to date
Services Provided:
- Site Appraisal - topsoil assessment, drainage, topography.
- 3 Dimensional computer generated ground modelling.
- Detailed design of drainage and pitch profile design.
- Preparation of Specifications and Construction Drawings for natural grass rugby
pitches.
- Assessment and approval of construction materials.
- Ongoing site monitoring.
General:
The scheme involved the construction of natural grass pitches to provide stadium
and training facilities of the highest standard. The stadium pitch construction
essentially comprised a system of perforated pipe drains laid in the laser graded
formation connected to a perimeter carrier drainage system. The pitch base consists
of a grit drainage layer placed over an intensive pipe drainage system. The upper
form of pitch construction consists of site derived topsoil placed over the grit
drainage layer with a system of slit drains cut through the topsoil to provide the
necessary surface drainage. The surface of the profile was ameliorated with approved
medium-fine sand immediately prior to seeding. At the appropriate stages during
construction the pitch irrigation was installed. The scope of the stadium and training
pitch construction and associated works included: |
Natural Turf Stadium Pitch:
- Earthworks cut and fill.
- Installation of cut off and pitch drainage systems and connection to main perimeter
drainage carrier pipes and outlets.
- Supply and spread drainage layer consisting of clean grit.
- Supply and spread site derived topsoil.
- Installation of forced slit drains.
- Sand amelioration of topsoil.
- Consolidation and preparation of rootzone material for sowing.
- Sowing approved grass seed mixtures.
- Topsoiling of outer pitch margins.
- Initial maintenance to establish the grass cover.
Natural Turf Training Pitches:
- Subsoil laser grading.
- Topsoil replacement.
- Installation of cut off and pitch drainage systems and connection to main drainage
outlets.
- Topsoil sand amelioration.
- Sowing of approved grass seed mixtures.
- Initial maintenance to establish the grass cover.